"Using Oplit means less pressure, less stress, and less disorganization in the daily work of planners. You promised us a dream, something incredible, and you delivered."

"Using Oplit means less pressure, less stress, and less disorganization in the daily work of planners. You promised us a dream, something incredible, and you delivered."

Vincent Guinard, Production Supervisor at Lisi Aerospace

How Lisi Aerospace replaced a heavy Excel-based planning process with Oplit and gained a full day back every month per planner.

About

Lisi Aerospace

Lisi Aerospace, a major player in the aerospace industry, places the digitalization of its industrial operations and innovation at the heart of its growth strategy.

The Saint-Ouen-l'Aumône site produces large volumes of screws and nuts for the aerospace industry. The site supplies numerous clients, making production planning a critical lever to meet delivery commitments and customer expectations.

Impact

3 days

saved per logistician per month.

3 days

saved per logistician per month.

1 day vs 2 weeks

to onboard a new user on the solution.

1 day vs 2 weeks

to onboard a new user on the solution.

+20%

production goal adherence rate.

+20%

production goal adherence rate.

The story

Lisi Aerospace is a major player in the aerospace industry, with digitalization and innovation at the heart of its growth strategy. The Saint-Ouen-l'Aumône site produces bolts and nuts for the aerospace sector at high volume, serving numerous clients. With a 3-month lead time and complex load/capacity dynamics, planning precision is critical to meeting delivery commitments and customer expectations.

The challenge

Before Oplit, load/capacity analysis at Lisi Aerospace relied on a particularly heavy Excel file. Updating the data through extractions and macros required significant time from the logistics team, often taking three quarters of a day for two people just to make the file usable. The process was stressful, done at the last minute to keep data as fresh as possible, and completely non-collaborative since only one person could work on it at a time. Simulation horizon was limited to one month, while the actual lead time was three months. In planning meetings, the team could only present preliminary estimates, and sessions ended with as many open questions as decisions made.

Oplit's approach

Oplit replaced the Excel file with a live, collaborative planning environment. Data updates happen automatically, eliminating the three-quarters-of-a-day manual update process. Planners can now instantly see the impact of any change on the organization, run hypothetical scenarios, and project capacity over a meaningful time horizon aligned with the actual 3-month lead time. The team schedule for capacity calculation is described by Vincent as simply remarkable, and automatic production target tracking allows immediate identification of where things are not on track.

Oplit is now used daily by the production supervisor and the planning team. Planning meetings have become more dynamic and strategic: instead of updating data and drawing conclusions, the team now builds hypotheses, runs live scenarios, and makes decisions using a shared operational language. New collaborators can take ownership of the solution on their first day, compared to the two weeks previously needed just to understand the Excel file. The solution is also enabling better standardization of best practices across Lisi's different industrial sites.

Beyond day-to-day planning, Oplit has become a tool for strategic decision-making. The team uses it to simulate capacity scenarios, anticipate workload peaks, and make faster, better-informed decisions in planning reviews. Transparency has improved across all sites, and the quality of conversations has increased significantly. The next steps for Lisi include extending Oplit's use to scheduling and raw material supply automation.

Discover other case studies :

From staticplanning to autonomous factory orchestration. Discover the Teknor Apex story.

From static planning to autonomous factory orchestration. Discover the Teknor Apex story.

From Excel chaos to precision planning. Discover the Vaucher story.

Less stress, more decisions. Discover the Lisi Aerospace story.

From chronic delays to ahead of schedule.

How they deployed Oplit across 14 sites in 9 months.

How they deployed Oplit across 14 sites in 6 months.

Flexibility as a competitive weapon. Discover the Ramondin story.

Join 100+ industrial companies

Unlock millions trapped in operational complexity